SMS alignment off by about 1/2 cm causing sample move failure. Re-aligned SMS.

VeReRt
CP1:AT.HAND.GP2.030.490.0
CP1:CLEAR.HAND.GP23.00.090.0
HAND.GP16.519.990.1
CP31:RACK P119.54.776.6
CP31:RACK P219.54.743.7
CP31:RACK P319.527.249.7
CP191:MAGNET13.429.6259.3
CP191:CLEAR34.00.0259.3

Similar Posts

  • Odyssey – SMS Install

    Completed Install of SMS Robot and SYS-V Controller. Customer had table, cables and interface cards. Vertical Reach Rotation CP1:AT.HAND.GP 1.8 30.3 89.9 CP1:CLEAR.HAND.GP 24.8 0.0 89.9 HAND.GP 16.2 19.9 89.8 CP31:RACK P1 19.5 4.7 76.3 CP31:RACK P2 19.5 4.6 43.2 CP31:RACK P3 19.5 27.2 49.3 CP191:MAGNET 19.3 21.9 272.0 CP191:CLEAR 34.0 0.0 272.0

  • FSU – Water Damage

    Water Damage NMR had a failure with the air dryer system that caused water to enter the airlines of system all the way thru the shim coil. Had to replace the following: All system air solenoids Shim Coil Also had to clean the upper barrel for proper spinning. Shim Coil was replaced with an Oxford…

  • FSU Shimming – 100322

    Lineshape does not meet spec. Needs 3D Gradient shimming. Found that the upper barrel was not centered in magnet field. Re-centered upper barrel. Performed 3D gradient shimming successfully. Obtained lineshape spec after RT shimming. Performed H1 and C13 performance specs, all passed. Default shims and power level vales saved. New gradient map saved.

  • Concordia PM_080921

    Probe HCN_0775_sem HCN_3512_sem Shims HCN_0775_sem_lk_d20 HCN_3512_sem_lk_d2o h1pw90 7.8us @ 52 7.5us @ 51 lshp_ns 0.74/8.59/10.6 0.60/5.18/8.09 lshp 0.33/2.73/4.92 0.30/1.89/2.09 h1sn 702:1 877:1 f19pw90 9us @ 52 — f19sn 109:1 — c13pwx 14.8us @ 60 24.7us @ 60 c13gamah2 8065 @ 43 8065 @ 48 n15pwx 33us @ 60 — gzprofile 32.8 G/cm 62.8 G/cm gzrecovery…