Carbonet Move
De-Energize and Pack
De-energized and packed system for shipment to Canada. System was de-energized and warmed up and then packed into Oxford shipping crate (including sides). Four pieces were shipped to IET for final crating and packing. Customer arranged for pickup by a freight carrier.
Found the following issued during benchmark;
- Remote Status box inop
- Missing Lock reject filter
- Probe glass insert broken
- AMT power out on low band is low
Recommended to customer to replace lock reject filter and remote status box and to have probe repaired by JSR. AMT can probably wait as its output is usable. All specs on benchmark passed (other than issued noted above).
| H1 | C13 | |
|---|---|---|
| CH 1 | 10 dBm | 12.8 dBm |
| CH 2 | 9.6 dBm | 12.2 dBm |
| AMT | 46.8 dBm (47 watts) | 50.7 dBm (120 watts) |
